Sales
Estimate Search
The history rather than the board. What was this rate priced at, for whom, on what kind of site, and did it win. Searches the estimate, its scope, its exclusions and every priced line inside it.
Matches
37
of 38 on record
Value matched
$77.1M
ex GST, current option
Won out of these
6
67% of the decided ones
Rates in the history
51
priced at least once
Mobilisation & site establishment
Site shed, amenities, first-aid, laydown set-out, initial cartage
Schedule rate
$18,450.00 / item
what the pricing schedule says
Priced on
37
6 of them won
Average priced
$18,450.00
+0.0% against schedule
Average when won
$18,450.00
+0.0% against schedule
| Estimate | Client | Site | Issued | Quantity | Priced at | Against schedule | Outcome |
|---|---|---|---|---|---|---|---|
| Q32419 Stage 9 wall repair | Village Roadshow Theme Parks | Oxenford | 7 Aug 2026 | 0.4 item | $18,450.00 | list | Estimating - Submitted |
| Q32456 Install only of Acoustic panel Cairns | Rosefield Group | Cairns | 5 Aug 2026 | 1 item | $18,450.00 | list | Estimating - Pending |
| Q32415 C19512 Female Ablution Block | Groote Eylandt Mining Company | Groote Eylandt, NT | 2 Aug 2026 | 0.35 item | $18,450.00 | list | Estimating - Submitted |
| Q32638 4x warehouse sheds | Brittabull Construction | Yeppoon | 1 Aug 2026 | 1 item | $18,450.00 | list | Estimating - In Progress |
| Q32131 Herston Health Precinct, Plantroom Acoustic Enclosures | Hutchinson Builders | Herston, Brisbane | 1 Aug 2026 | 1 item | $18,450.00 | list | Estimating - In Progress |
| Q32611 18 Pandanus Parade, Cabarita Beach | Proline Builders | Cabarita Beach | 27 Jul 2026 | 0.3 item | $18,450.00 | list | Estimating - Pending |
| Q32129 Weipa Bulk Store, Re-clad | Duratec Australia | Weipa | 26 Jul 2026 | 1 item | $18,450.00 | list | Estimating - In Progress |
| Q32400 Mooloolah Valley Distribution Reservoir | Dornway Civil | Mooloolah Valley | 20 Jul 2026 | 1 item | $18,450.00 | list | Estimating - Pending |
| Q32441 Hastings Deering | Hastings Deering (Australia) | Mackay | 16 Jul 2026 | 1 item | $18,450.00 | list | Contract Review |
| Q32106 Yarwun Alumina: Filtration Building Re-sheet | Rio Tinto Aluminium | Yarwun, Gladstone | 16 Jul 2026 | 1 item | $18,450.00 | list | Estimating - Submitted |
| Q32604 Warehouse 4, Kunda Park Industrial Estate | McNab Constructions | Kunda Park | 14 Jul 2026 | 0.4 item | $18,450.00 | list | Estimating - Submitted |
| Q32127 Springfield Central Retail, Roof Renewal | ADCO Constructions | Springfield Central | 10 Jul 2026 | 1 item | $18,450.00 | list | Estimating - Submitted |
| Q32592 Logan Hyperdome | ADCO Constructions | Loganholme | 8 Jul 2026 | 2 item | $18,450.00 | list | Estimating - Pending |
| Q32125 Wacol Distribution Centre, Cladding & Roofing | Walz Group | Wacol | 4 Jul 2026 | 1 item | $18,450.00 | list | Estimating - Submitted |
| Q32588 Coolum Beach Surf Club, roof renewal | Mountain Creek State High School, Dept of Education | Coolum Beach | 30 Jun 2026 | 1 item | $18,450.00 | list | Contract Review |
| Q32101 Damascus Barracks B012: Roof Renewal | Department of Defence, Estate & Infrastructure | Meeandah | 19 Jun 2026 | 1 item | $18,450.00 | list | Estimating - Submitted |
| QPL2376 CONFIDENTIAL - Project Braemer | OPB Contractors | Undisclosed, QLD | 10 Jun 2026 | 8 item | $18,450.00 | list | Estimating - In Progress |
| Q32358 Groote Island | Groote Eylandt Mining Company | Groote Eylandt, NT | 7 Jun 2026 | 4 item | $18,450.00 | list | Estimating - Pending |
| Q32122 Bengalla VDC Re-roof Stage 2 | Bengalla Mining Company | Bengalla Mine, Muswellbrook | 6 Jun 2026 | 1 item | $18,450.00 | list | Won |
| Q27686 Bengalla CHPP | Family Constructions | Bengalla Mine, Muswellbrook | 5 Jun 2026 | 3 item | $18,450.00 | list | Estimating - Submitted |
| Q32582 Groote Island Gemco MWS Re-roof | Groote Eylandt Mining Company | Groote Eylandt, NT | 26 May 2026 | 2 item | $18,450.00 | list | Estimating - In Progress |
| Q32364 Groote Island, Flo Jo's | Groote Eylandt Mining Company | Groote Eylandt, NT | 14 May 2026 | 2 item | $18,450.00 | list | Estimating - Submitted |
| Q32113 QCLNG Train 2: Acoustic Enclosure Refit | Australia Pacific LNG | Curtis Island | 6 May 2026 | 1 item | $18,450.00 | list | Won |
| Q32119 Northshore Hamilton: Commercial Roof Package | McNab Constructions | Hamilton, Brisbane | 22 Apr 2026 | 1 item | $18,450.00 | list | Lost |
| Q32118 Mountain Creek SHS, Hall Re-roof | Mountain Creek State High School, Dept of Education | Mountain Creek | 9 Apr 2026 | 1 item | $18,450.00 | list | Won |
| Q32111 Gladstone Port: Shiploader Walkway Cladding | Duratec Australia | Gladstone | 13 Mar 2026 | 1 item | $18,450.00 | list | Lost |
| Q32235 The Mine, Burnett Highway | Morgan Projects | Burnett Highway | 28 Feb 2026 | 3 item | $18,450.00 | list | Contract Review |
| Q32116 M&A Apartments Stage 3: Facade Cladding | M&A Developments | Maroochydore | 27 Feb 2026 | 1 item | $18,450.00 | list | Won |
| Q32274 21 Kidman Place, Keperra, QLD, 4054 | Proline Builders | Keperra | 26 Feb 2026 | 0.3 item | $18,450.00 | list | Estimating - Pending |
| Q32108 Toowoomba Wellcamp: Freight Shed Re-clad | Walz Group | Wellcamp | 14 Feb 2026 | 1 item | $18,450.00 | list | Lost |
| Q32916 Hillgrove Mine | MACA Interquip | Hillgrove Mine, Armidale NSW | 27 Jan 2026 | 2 item | $18,450.00 | list | Estimating - Pending |
| T-2025-0092 Saraji Workshop Upgrade: Cladding | BHP Mitsubishi Alliance | Saraji Mine, Dysart | 23 Dec 2025 | 1 item | $18,450.00 | list | Won |
| Q22087 Mineral Sands Plant | Ausenco Services | Capel, WA | 18 Nov 2025 | 3 item | $18,450.00 | list | Estimating - Submitted |
| T-2025-0088 Boyne Smelters Stockpile Shed: Re-clad & Acoustics | Rio Tinto Aluminium | Boyne Island | 14 Nov 2025 | 1 item | $18,450.00 | list | Won |
| Q32096 Caloundra Sth West Primary School, Stage 2 | Hutchinson Builders | Caloundra South | 28 Oct 2025 | 1 item | $18,450.00 | list | Estimating - Submitted |
| Q27503 Processing Building Townsville | Sedgman Pty Ltd | Townsville | 12 Sep 2024 | 2 item | $18,450.00 | list | Estimating - Submitted |
| Q27693 Ravensworth Coal | Glencore Coal Assets Australia | Ravensworth, NSW | 18 Jul 2024 | 2 item | $18,450.00 | list | Estimating - Submitted |
A rate priced above the schedule is a loaded rate: difficult access, a shutdown, freight, or a client QClad have been burnt by. Priced below is a sharpened one. Either way it is on the record, so the next estimator can see what was done and why rather than starting from the list price.
Matches
Newest first. Each row shows which of its priced lines matched.
Stage 9 wall repair
Village Roadshow Theme Parks · Oxenford · issued 7 Aug 2026 · Priya Raghavan
Strip and replace damaged wall sheeting to the Stage 9 back-of-house elevation, renew flashings and cappings and reseal all penetrations. Park operating, so work is out of hours.
$217,346
11 lines
Install only of Acoustic panel Cairns
Rosefield Group · Cairns · issued 5 Aug 2026 · Priya Raghavan
Install only of client-supplied acoustic absorption panel and perforated liner tray to the plantroom walls and ceiling, including isophonic mounts and post-installation verification test.
$330,538
11 lines
C19512 Female Ablution Block
Groote Eylandt Mining Company · Groote Eylandt, NT · issued 2 Aug 2026 · Priya Raghavan
Roof and wall cladding to a new female ablution block, including insulation, flashings, rainwater goods and weatherproofing.
$202,150
12 lines
4x warehouse sheds
Brittabull Construction · Yeppoon · issued 1 Aug 2026 · Priya Raghavan
Roof and wall cladding to four new warehouse sheds: TRIMDEK roof, CUSTOM ORB wall, insulation, safety mesh, flashings, cappings, rainwater goods and roof anchors to each.
$2,047,008
17 lines
Herston Health Precinct, Plantroom Acoustic Enclosures
Hutchinson Builders · Herston, Brisbane · issued 1 Aug 2026 · Dylan Fraser
Supply and install acoustic enclosures, absorption panel, liner tray and isophonic mounts to four rooftop plantrooms, with independent verification testing to 38 dB(A) at the boundary.
$1,054,494
11 lines
18 Pandanus Parade, Cabarita Beach
Proline Builders · Cabarita Beach · issued 27 Jul 2026 · Priya Raghavan
Replace hail-damaged TRIMDEK roof sheeting, ridge, barge and rainwater goods, and reseal all penetrations.
$60,489
8 lines
Weipa Bulk Store, Re-clad
Duratec Australia · Weipa · issued 26 Jul 2026 · Dylan Fraser
Strip and replace wall cladding and roof sheeting to the bulk store, including purlin and girt replacement where corroded, to cyclone region C.
$1,616,818
12 lines
Mooloolah Valley Distribution Reservoir
Dornway Civil · Mooloolah Valley · issued 20 Jul 2026 · Dylan Fraser
Strip and renew the reservoir roof in KLIP-LOK 700, replace corroded purlins on a provisional quantity, renew safety mesh, ridge and rainwater goods, and install an anchor and static line system for future access.
$724,376
15 lines
Hastings Deering
Hastings Deering (Australia) · Mackay · issued 16 Jul 2026 · Priya Raghavan
Strip and replace the Wheel Ends workshop roof in KLIP-LOK 700, renew safety mesh and roof lighting, replace box gutters and downpipes, and install a permanent anchor and static line system.
$1,084,248
17 lines
Yarwun Alumina: Filtration Building Re-sheet
Rio Tinto Aluminium · Yarwun, Gladstone · issued 16 Jul 2026 · Dylan Fraser
Strip and re-sheet the filtration building roof and upper walls, including purlin renewal where corroded and a new certified anchor system.
$1,021,052
13 lines
Warehouse 4, Kunda Park Industrial Estate
McNab Constructions · Kunda Park · issued 14 Jul 2026 · Priya Raghavan
Replace storm-damaged CUSTOM ORB wall sheeting to the southern elevation and the translucent roof lighting to bays 4 to 7, with flashings and weatherproofing.
$119,464
7 lines
Springfield Central Retail, Roof Renewal
ADCO Constructions · Springfield Central · issued 10 Jul 2026 · Priya Raghavan
Strip and re-sheet the retail roof in KLIP-LOK 406, new blanket insulation, safety mesh, box gutters and roof lighting.
$816,296
10 lines
Logan Hyperdome
ADCO Constructions · Loganholme · issued 8 Jul 2026 · Priya Raghavan
Strip and re-sheet the northern retail wing in KLIP-LOK 406, renew box gutters and rainwater goods, install a permanent anchor and static line system, and weatherproof all penetrations. Trading centre, so all work is out of hours.
$1,852,362
17 lines
Wacol Distribution Centre, Cladding & Roofing
Walz Group · Wacol · issued 4 Jul 2026 · Priya Raghavan
New KLIP-LOK 700 wall cladding and TRIMDEK roof sheeting to the distribution centre, flashings, personnel doors and sealant.
$1,460,526
10 lines
Coolum Beach Surf Club, roof renewal
Mountain Creek State High School, Dept of Education · Coolum Beach · issued 30 Jun 2026 · Priya Raghavan
Strip and renew the eastern pavilion roof in KLIP-LOK 700 with insulation, safety mesh, ridge, box gutter and downpipes. Salt-air specification throughout.
$304,506
13 lines
Damascus Barracks B012: Roof Renewal
Department of Defence, Estate & Infrastructure · Meeandah · issued 19 Jun 2026 · Dylan Fraser
Strip and replace the B012 roof in KLIP-LOK 700, insulation, safety mesh and a certified anchor system, all personnel security-cleared.
$581,834
12 lines
CONFIDENTIAL - Project Braemer
OPB Contractors · Undisclosed, QLD · issued 10 Jun 2026 · Dylan Fraser
Supply and install Kingspan KS1000 RW insulated panel to the process buildings, cold stores and control rooms of an energy hub development, with EquiDeck insulated roof panel, full weatherproofing and permanent access systems throughout.
$27,891,784
18 lines
Groote Island
Groote Eylandt Mining Company · Groote Eylandt, NT · issued 7 Jun 2026 · Dylan Fraser
A bundled price across four structures on Groote: the heavy vehicle wash bay, the reagent store, the crib and change facility and the conveyor transfer house. Roof, wall, safety systems and weatherproofing to each.
$4,440,878
23 lines
Bengalla VDC Re-roof Stage 2
Bengalla Mining Company · Bengalla Mine, Muswellbrook · issued 6 Jun 2026 · Dylan Fraser
Strip and re-sheet the VDC roof in Stramit Speed Deck Ultra over new purlins, with safety mesh, blanket insulation, box gutters and a certified static line system.
$1,765,226
16 lines
Bengalla CHPP
Family Constructions · Bengalla Mine, Muswellbrook · issued 5 Jun 2026 · Dylan Fraser
Full re-roof of the coal preparation plant over live process equipment: strip, purlin renewal on a provisional quantity, KLIP-LOK 700, insulation, safety mesh, ridge ventilators and a permanent static line system.
$2,796,934
22 lines
Groote Island Gemco MWS Re-roof
Groote Eylandt Mining Company · Groote Eylandt, NT · issued 26 May 2026 · Dylan Fraser
Second stage re-roof over the mobile plant workshop: strip, purlin renewal on a measured quantity, KLIP-LOK 700, insulation, safety mesh, roof lighting and full rainwater goods, over a live workshop.
$2,989,072
21 lines
Groote Island, Flo Jo's
Groote Eylandt Mining Company · Groote Eylandt, NT · issued 14 May 2026 · Dylan Fraser
Replace corroded structural elements and purlins and re-roof the Flo Jo's accommodation and messing structures, including safety mesh, rainwater goods and a permanent access system.
$1,626,630
19 lines
QCLNG Train 2: Acoustic Enclosure Refit
Australia Pacific LNG · Curtis Island · issued 6 May 2026 · Dylan Fraser
Strip and replace the acoustic enclosure to the Train 2 compressor, with new absorption panel, barrier mat and isophonic mounts, and a verification test to the acoustic report.
$1,156,242
10 lines
Northshore Hamilton: Commercial Roof Package
McNab Constructions · Hamilton, Brisbane · issued 22 Apr 2026 · Priya Raghavan
TRIMDEK roof sheeting, insulation, safety mesh, box gutters and roof lighting to the commercial building.
$581,852
9 lines
Mountain Creek SHS, Hall Re-roof
Mountain Creek State High School, Dept of Education · Mountain Creek · issued 9 Apr 2026 · Priya Raghavan
Strip and re-sheet the hall roof in KLIP-LOK 406 with insulation, safety mesh, new gutters and downpipes, plus edge protection for the duration.
$945,534
17 lines
Gladstone Port: Shiploader Walkway Cladding
Duratec Australia · Gladstone · issued 13 Mar 2026 · Dylan Fraser
Cladding and weatherproofing to the shiploader walkway and transfer house, by rope access.
$347,974
7 lines
The Mine, Burnett Highway
Morgan Projects · Burnett Highway · issued 28 Feb 2026 · Dylan Fraser
Roof and wall cladding to the H1 extra buildings: workshop, wash bay, store and crib. Insulated panel to the crib, sheet elsewhere, with permanent access systems throughout.
$3,051,040
22 lines
M&A Apartments Stage 3: Facade Cladding
M&A Developments · Maroochydore · issued 27 Feb 2026 · Dylan Fraser
Fielders Finesse architectural panel to the street elevations, KingKlip to the return walls, cappings, membrane and sealant.
$1,063,286
12 lines
21 Kidman Place, Keperra, QLD, 4054
Proline Builders · Keperra · issued 26 Feb 2026 · Priya Raghavan
Storm damage repair: replace 240 m² of damaged TRIMDEK roof sheeting, ridge and barge, two downpipes and a rainhead, and reseal all penetrations. Assessor's scope governs.
$61,625
8 lines
Toowoomba Wellcamp: Freight Shed Re-clad
Walz Group · Wellcamp · issued 14 Feb 2026 · Priya Raghavan
Strip and replace wall cladding to the freight shed.
$362,334
6 lines
Hillgrove Mine
MACA Interquip · Hillgrove Mine, Armidale NSW · issued 27 Jan 2026 · Dylan Fraser
Roof and wall cladding to the concentrate filter extension and the tails filter building, including insulated panel to the filter room, safety mesh, anchor and static line systems and full weatherproofing.
$2,698,446
21 lines
Saraji Workshop Upgrade: Cladding
BHP Mitsubishi Alliance · Saraji Mine, Dysart · issued 23 Dec 2025 · Dylan Fraser
Strip and replace roof sheeting and wall cladding to the heavy workshop, purlin renewal, louvres, personnel doors and a certified anchor system.
$2,470,624
21 lines
Mineral Sands Plant
Ausenco Services · Capel, WA · issued 18 Nov 2025 · Dylan Fraser
Cladding and acoustic treatment to the mineral sands plant: insulated panel to the process building, mass-loaded barrier and absorption panel to the screening tower, roof sheeting throughout and a verification test at the boundary.
$2,570,588
19 lines
Boyne Smelters Stockpile Shed: Re-clad & Acoustics
Rio Tinto Aluminium · Boyne Island · issued 14 Nov 2025 · Dylan Fraser
Re-clad the stockpile shed and install an acoustic enclosure to the transfer tower, verified by independent sound test.
$2,542,100
19 lines
Caloundra Sth West Primary School, Stage 2
Hutchinson Builders · Caloundra South · issued 28 Oct 2025 · Priya Raghavan
Roof and wall cladding to Blocks C and D: KLIP-LOK 406 roof, Fielders Finesse architectural cladding to the street elevations, CUSTOM ORB elsewhere, insulation, safety mesh, rainwater goods and permanent roof anchors.
$1,496,856
19 lines
Processing Building Townsville
Sedgman Pty Ltd · Townsville · issued 12 Sep 2024 · Priya Raghavan
Budget pricing only for the roof and wall cladding to a new processing building, for Sedgman's feasibility study. Rates current at the date of issue.
$1,347,684
10 lines
Ravensworth Coal
Glencore Coal Assets Australia · Ravensworth, NSW · issued 18 Jul 2024 · Dylan Fraser
Strip and replace corroded wall sheeting and girts to the CHPP and the reclaim tunnel headhouse, including flashings, cappings and weatherproofing.
$1,366,084
13 lines