Site
Site Forms
Every form the field fills in, numbered the way QClad number them. The sequence never resets, so HSE_FRM_006_1309 is the 1,309th plant prestart since the register was opened.
On the register
20
9 form types in use
Open findings
6
something to close out
In draft
1
started and not submitted
Form types
10
each with its own sequence
Register
Newest first. Anything Open has a finding somebody has to close.
| Number | Form | Job | Subject | By | Date | State | |
|---|---|---|---|---|---|---|---|
| HSE_FRM_008_773 | Working at Heights Permit | QJ2006 | Shed 1 north slope, 06:00 to 16:00 | Zeb Marchetti | 12 Aug 2026 | Open | |
| HSE_FRM_008_772 | Working at Heights Permit | QJ2041 | Lindum canopy, night possession 22:00 to 05:00 | Blake Tuiala | 12 Aug 2026 | Open | |
| HSE_FRM_006_1311 | Plant Prestart Checklist | QJ2006 | Genie Z-45/25J boom, 4,182 hrs Left front tyre at 60% tread, flagged for replacement at next service. | Zeb Marchetti | 12 Aug 2026 | Open | |
| HSE_FRM_006_1310 | Plant Prestart Checklist | QJ2041 | Snorkel A62JRT boom, 2,904 hrs | Blake Tuiala | 12 Aug 2026 | Closed | Blake Tuiala |
| HSE_FRM_006_1309 | Plant Prestart Checklist | QJ2039 | Dingo K9-4 mini loader, 1,186 hrs | Dom Falzon | 12 Aug 2026 | Closed | Dom Falzon |
| HSE_FRM_001_4181 | Take 5 | QJ2006 | Flashing install, Shed 1 south | Fletcher Doig | 12 Aug 2026 | Draft | |
| HSE_FRM_001_4180 | Take 5 | QJ2039 | Strip sheeting, workshop bay 9 | Marlon Deverell | 12 Aug 2026 | Closed | Marlon Deverell |
| HSE_FRM_001_4179 | Take 5 | QJ2041 | Box gutter install, Buranda platform | Dane Kelso | 12 Aug 2026 | Closed | Dane Kelso |
| HSE_FRM_011_340 | Hazard Report | QJ2006 | Unsecured mesh panel, Shed 2 north Panel left unfixed at end of shift. Exclusion zone in place until fixed. | Levi Sandford | 11 Aug 2026 | Open | |
| HSE_FRM_008_771 | Working at Heights Permit | QJ2039 | Workshop main span, bays 8 to 14 | Dom Falzon | 11 Aug 2026 | Closed | Dom Falzon |
| HSE_FRM_006_1308 | Plant Prestart Checklist | QJ2044 | Genie S-65 boom, 5,412 hrs | Mitch Ravenscroft | 11 Aug 2026 | Closed | Mitch Ravenscroft |
| HSE_FRM_006_1307 | Plant Prestart Checklist | QJ2006 | Toyota Hilux 4x4, QCL-118 | Zeb Marchetti | 11 Aug 2026 | Closed | Zeb Marchetti |
| HSE_FRM_002_188 | Toolbox Talk | QJ2006 | Heat stress and fluid intake on a 21 and 7 | Zeb Marchetti | 10 Aug 2026 | Closed | Zeb Marchetti |
| HSE_FRM_002_187 | Toolbox Talk | QJ2041 | Offcut control and exclusion zones | Blake Tuiala | 10 Aug 2026 | Closed | Blake Tuiala |
| HSE_FRM_014_287 | Site Inspection | QJ2006 | Monthly site inspection, Ceres Laydown area sediment fence damaged in the 7 Aug 2026 blow. Reinstate before the next rain event. | Sam Kirkwood | 9 Aug 2026 | Open | |
| HSE_FRM_019_153 | Environmental Inspection | QJ2039 | Environmental inspection, Groote Waste segregation bins unlabelled at the barge landing. Labels ordered. | Sam Kirkwood | 8 Aug 2026 | Open | |
| HSE_FRM_003_961 | SWMS Sign-on | QJ2006 | SWMS-QC-014 rev D, roof sheeting at height | Zeb Marchetti | 7 Aug 2026 | Closed | Sam Kirkwood |
| HSE_FRM_003_960 | SWMS Sign-on | QJ2039 | SWMS-QC-022 rev B, working over live plant | Dom Falzon | 6 Aug 2026 | Closed | Sam Kirkwood |
| HSE_FRM_022_60 | Emergency Drill Record | QJ2006 | Muster drill, Shed 1 laydown | Zeb Marchetti | 4 Aug 2026 | Closed | Sam Kirkwood |
| HSE_FRM_014_286 | Site Inspection | QJ2044 | Monthly site inspection, Saraji | Sam Kirkwood | 2 Aug 2026 | Closed | Sam Kirkwood |
Nothing matches that filter.
Form types
Each carries its own running sequence. The next number is what the register will issue.
| Code | Form | Filled in by | When | Fields | On the register | Next number |
|---|---|---|---|---|---|---|
| HSE_FRM_001 | Take 5 | Any worker | Before every task | Task · What could hurt me · Controls in place · Am I fit for this task · Sign on | 3 | HSE_FRM_001_4182 |
| HSE_FRM_002 | Toolbox Talk | Leading hand | Weekly, and after any incident | Topic · Attendees · Points raised · Actions · Sign on | 2 | HSE_FRM_002_189 |
| HSE_FRM_003 | SWMS Sign-on | Leading hand | On mobilisation and on any change | SWMS reference · Revision · High-risk activities · Attendees · Sign on | 2 | HSE_FRM_003_962 |
| HSE_FRM_006 | Plant Prestart Checklist | Any worker | Every shift, per item of plant | Plant · Hours reading · Fluids · Tyres and tracks · Lights and horn · Emergency stop · Harness points · Defects | 5 | HSE_FRM_006_1312 |
| HSE_FRM_008 | Working at Heights Permit | Supervisor | Per shift, per elevated work area | Work area · Fall protection · Edge protection · Rescue plan · Exclusion zone · Permit hours | 3 | HSE_FRM_008_774 |
| HSE_FRM_011 | Hazard Report | Any worker | Whenever one is found | Hazard · Location · Risk rating · Immediate control · Reported to | 1 | HSE_FRM_011_341 |
| HSE_FRM_014 | Site Inspection | HSEQ | Monthly per job | Housekeeping · Access and egress · Plant · PPE · Environmental · Findings | 2 | HSE_FRM_014_288 |
| HSE_FRM_017 | Incident Report | Supervisor | Immediately | What happened · Injury · Immediate action · Notifiable · Investigation owner | 0 | HSE_FRM_017_96 |
| HSE_FRM_019 | Environmental Inspection | HSEQ | Monthly per job | Spill controls · Waste segregation · Sediment controls · Noise · Findings | 1 | HSE_FRM_019_154 |
| HSE_FRM_022 | Emergency Drill Record | Supervisor | Quarterly per job | Scenario · Muster time · Attendees · Issues found · Actions | 1 | HSE_FRM_022_61 |