QClad
QClad
INV-26-0394 Demo Rio Tinto Aluminium · Boyne Smelters Stockpile Shed: Re-clad & Acoustics
Accounting connected Wed 5 Aug 2026
INV-26-0394 Paid Ledger XRO-4116

Tax invoice INV-26-0394

Against certified claim PC-2026-0180 · PRJ-2026-038 · Rio Tinto Aluminium

QClad

Roofing · Cladding · Acoustics

Tax invoice

INV-26-0394

Issued 17 Jul 2026

From

QClad Services Pty Ltd

ABN 62 138 704 915

QBCC 1174 320

Unit 2/9-11 Lenco Cres, Landsborough QLD 4550

07 5474 4966 · admin@qclad.com

Bill to

Rio Tinto Aluminium

ABN 15 009 679 127

Grant Hollows, Superintendent, Fixed Plant

grant.hollows@riotinto.com

Boyne Island QLD

Reference

RTA-BSL-SC-88104

Boyne Smelters Stockpile Shed: Re-clad & Acoustics

Boyne Island, Gladstone, QLD

Claim PC-2026-0180 · no. 5

Period: Jun 2026

Terms: 45 days EOM · due 4 Aug 2026

Construction work certified this period

ItemRateMeasured to dateValue, ex GST
RS-PRE-MOB Mobilisation & site establishment $18,450.00/item 1 item $18,450.00
RS-PRE-SWM SWMS, JSA & site-specific safety plan $2,680.00/item 1 item $2,680.00
RS-PRE-IND Site induction & verification of competency $585.00/ea 14 ea $8,190.00
RS-PRE-SUP Site supervision, leading hand $1,248.00/day 93.22 day $116,338.56
RS-CLD-STR Strip existing wall cladding & dispose $48.60/m² 4,004.4 m² $194,613.84
RS-CLD-CUS CUSTOM ORB wall cladding, install $107.80/m² 3,663.6 m² $394,936.08
RS-ROF-TRM TRIMDEK roof sheeting, install $97.80/m² 1,710.8 m² $167,316.24
RS-ACO-PNL Acoustic absorption panel, install $229.00/m² 892.8 m² $204,451.20
RS-ACO-LIN Perforated acoustic liner tray, install $264.00/m² 567.6 m² $149,846.40
RS-ACO-BAR Mass-loaded acoustic barrier mat, install $156.00/m² 868 m² $135,408.00
RS-ACO-ISO Isophonic bracket & resilient mount system $89.40/m² 917.6 m² $82,033.44
RS-ACO-ENC Plant acoustic enclosure, fabricate and install $482.00/m² 182.4 m² $87,916.80
RS-HGT-ROP Rope access technician, IRATA $1,480.00/day 78.72 day $116,505.60
RS-HGT-STA Static line system: supply, install & certify $286.00/lm 281.6 lm $80,537.60
RS-CLD-FLA Custom flashings, supply and install $114.00/lm 784 lm $89,376.00
RS-WPF-SEA Sealant to laps, penetrations & flashings $34.80/lm 2,032.8 lm $70,741.44
RS-WPF-MEM Liquid-applied weatherproof membrane $162.00/m² 231 m² $37,422.00
RS-ACO-ENC Plant acoustic enclosure, fabricate and install · VAR-038-01 $482.00/m² 82.56 m² $39,793.92
RS-ACO-BAR Mass-loaded acoustic barrier mat, install · VAR-038-01 $156.00/m² 154.8 m² $24,148.80
RS-ACO-ISO Isophonic bracket & resilient mount system · VAR-038-01 $89.40/m² 154.8 m² $13,839.12
RS-HGT-ROP Rope access technician, IRATA · VAR-038-02 $1,480.00/day 29.24 day $43,275.20
Summary of the measure supporting claim PC-2026-0180. The full schedule of rates is attached to the payment claim.
Certified this claim, ex GST$315,740.94
Less retention at 5%($15,787.05)
Subtotal, ex GST$299,953.89
GST at 10%$29,995.39
Total due, inc GST$329,949.28

Payment

Electronic funds transfer

NAB Caloundra

BSB 084-462 · Account 5813 02947

Reference: INV-26-0394

Due 4 Aug 2026, 45 days EOM

Retention of $15,787.05 is withheld under the contract. Half is released at practical completion and the balance at the end of the defects liability period.

QClad Services Pty Ltd · ABN 62 138 704 915 · QBCC 1174 320 · PO Box 292, Landsborough QLD 4550 · 07 5474 4966 · admin@qclad.com · Ledger reference XRO-4116